# Renovating or Demolishing an Older Perth Home? Your Asbestos Checklist

> Renovating or demolishing an older Perth home? Use this asbestos checklist: test first, plan licensed removal, get clearance and keep your budget on track.

Source: https://www.proasbestosremovalperth.com.au/asbestos-checklist-renovation-demolition-perth/
Published: 27 November 2026 · Updated: 27 November 2026
Category: Asbestos Removal

Renovating a 1960s, 70s or 80s Perth home, knocking down an old shed or clearing a block for a rebuild? Asbestos is one of the first things to check, before the first wall comes down. Finding it halfway through a job can stop work, blow out your budget and expose your family, your neighbours and your trades to fibres. This checklist walks you through what to do before, during and after renovation or demolition on an older property.

## Before you start: the planning checklist

### 1. Work out the age of every part of the building

Asbestos was used in WA building products from the mid-1940s to the late 1980s. Check the original build date, and remember that extensions, sheds, carports, patios and earlier renovations may be from a different era to the main house.

### 2. List the areas you will disturb

Write down every area your project touches: walls being removed, wet areas being stripped, eaves being replaced, roofs, floors, fences, meter boards and anywhere you will drill or cut. These are the places to check first.

### 3. Get suspect materials tested

You can't tell asbestos from fibre cement by eye. Have samples taken and analysed by a NATA-accredited laboratory before work begins. [Read about asbestos testing](/asbestos-testing/), or see our guide on [how to identify asbestos in a Perth home](/how-to-identify-asbestos-perth-home/).

### 4. Tell your builder and trades what you found

Builders, electricians, plumbers and tilers need to know where asbestos is before they start. In WA, people who are paid to work on a property must identify asbestos before they begin and use safe work methods.

### 5. Check council and approval requirements

Demolition and some renovations need a permit from your local council, and the council may ask how asbestos will be managed. Some councils also want to be told about asbestos removal on residential properties. Check early so approvals don't hold up your project.

### 6. Book licensed removal before demolition

If there is more than 10 m² of bonded asbestos, or any friable asbestos, it must be removed by a licensed removalist before the area is demolished or renovated. WorkSafe WA must be notified at least five days before licensed removal starts, so build that into your timeline.

### 7. Plan around your household and neighbours

Decide who will be home during the work, where children and pets will be, and whether neighbours should be told. Your removalist will advise which areas need to be closed off and for how long.

## Common asbestos locations in renovation and demolition jobs

- **Bathroom and laundry upgrades:** wall sheeting behind tiles, ceiling sheeting and old vinyl.

- **Kitchen renovations:** splashbacks, vinyl flooring and backing, and wall sheeting.

- **Eaves and roof replacements:** flat eave sheeting and corrugated cement roofing.

- **Extensions and wall removals:** internal and external fibro walls, and window infill panels.

- **Electrical upgrades:** older meter boards.

- **Backyard projects:** fibro fences, sheds, garages, carports and patio roofs.

- **Full demolitions:** all of the above, plus any debris already in the soil around the building.

## During the job

- **Remove asbestos first.** Asbestos should come out before general demolition starts, not be knocked down with the rest of the building.

- **Seal and sign the area.** The work area is isolated with plastic sheeting, barriers and warning signs.

- **No power tools on asbestos.** Grinders, saws, sanders and high-pressure water are banned on asbestos materials in WA because they release fibres.

- **Keep everything damp.** Wet methods keep dust down during removal and clean-up.

- **Air monitoring.** Air monitoring is used where required, which is especially important for friable asbestos and occupied buildings.

- **Waste goes straight out.** Asbestos waste is wrapped, sealed and labelled and taken to a licensed facility. It must never go in a general skip.

## After removal: clearance before the next trade

Once the asbestos is out, the area is decontaminated and inspected. A clearance certificate is issued when the area is confirmed free of visible asbestos residue and safe to continue. Keep this certificate with your building records. It is useful for future sales, insurance and any later work on the property.

## Budget and timeline tips

- Test early. Results before you sign a building contract mean fewer surprises and variations later.

- Get asbestos removal quoted separately, with disposal included, so you can compare like with like.

- Allow at least the five-day WorkSafe notification period, plus time for clearance, before the next trade arrives.

- Bundle removal jobs where possible, for example the bathroom, eaves and shed in one visit, to reduce set-up costs.

## Demolishing a whole house or commercial building?

For full demolitions we can prepare an asbestos control plan, isolate the site, remove the asbestos and manage disposal, so your demolition contractor can start on a site that has been cleared of asbestos. [See our asbestos site demolition service](/asbestos-site-demolition/).

## Frequently asked questions

### Can my builder remove the asbestos?

Only small amounts, under 10 m² of bonded asbestos, can be removed without a licence. Anything larger, or any friable asbestos, must be removed by a licensed removalist.

### Do I need to move out during removal?

Often you don't, but the work area will be closed off. For larger jobs, or work involving friable asbestos, we may recommend staying elsewhere until clearance is issued.

### What happens if asbestos is found halfway through?

Stop work in that area, keep people away, and call a licensed removalist. Don't keep demolishing around it.

## Planning a renovation or demolition?

Call Pro Asbestos Removal Perth on [08 6001 6050](tel:0860016050) or [request a free quote](/quotes/). We can test, remove and dispose of asbestos before your project starts, across all of Perth Metro.

---
Pro Asbestos Removal Perth · 08 6001 6050 · info@proasbestosremovalperth.com.au · https://www.proasbestosremovalperth.com.au/
